Mission Critical - Consigli Construction Mon, 23 Dec 2024 21:03:00 +0000 en-US hourly 1 https://wordpress.org/?v=6.7.1 Automotive Systems Division (ASD) /project/asd-park-place/ Thu, 08 Jun 2023 20:01:53 +0000 /?post_type=project&p=16734 Renovation of 1 Park Place building for Bose Automotive Systems Division (ASD) at Bose’s Framingham headquarters. Scope included selective demolition, all new M/E/Ps, new fire service and finishes. The critical listening room has an elevated slab, extensive drywall/insulation details, custom fabric panels, M/E/Ps and finishes. Phase 2 fit-out included new… More >

The post Automotive Systems Division (ASD) first appeared on Consigli Construction.

The post Automotive Systems Division (ASD) appeared first on Consigli Construction.

]]>
Renovation of 1 Park Place building for Bose Automotive Systems Division (ASD) at Bose’s Framingham headquarters. Scope included selective demolition, all new M/E/Ps, new fire service and finishes. The critical listening room has an elevated slab, extensive drywall/insulation details, custom fabric panels, M/E/Ps and finishes. Phase 2 fit-out included new M/E/Ps, fire service, insulated sound bays, and finishes. The exterior envelope scope included preparing, repairing and painting the metal panel siding along the exterior of the building.

The post Automotive Systems Division (ASD) first appeared on Consigli Construction.

The post Automotive Systems Division (ASD) appeared first on Consigli Construction.

]]>
Occupied Headquarters Renovation /project/occupied-headquarters-renovation/ Mon, 23 Dec 2024 19:05:13 +0000 /?post_type=project&p=19588 This project focused on mission-critical infrastructure upgrades to support uninterrupted operations. Redundant power, cooling, and security systems were implemented to protect business continuity, including a first-of-its-kind lithium-ion UPS system. All work was meticulously planned and executed within an occupied facility, ensuring zero disruption to operations.

The post Occupied Headquarters Renovation first appeared on Consigli Construction.

The post Occupied Headquarters Renovation appeared first on Consigli Construction.

]]>
This project focused on mission-critical infrastructure upgrades to support uninterrupted operations. Redundant power, cooling, and security systems were implemented to protect business continuity, including a first-of-its-kind lithium-ion UPS system. All work was meticulously planned and executed within an occupied facility, ensuring zero disruption to operations.

The post Occupied Headquarters Renovation first appeared on Consigli Construction.

The post Occupied Headquarters Renovation appeared first on Consigli Construction.

]]>
Office Building Renovation /project/office-building-renovation/ Mon, 23 Dec 2024 19:22:56 +0000 /?post_type=project&p=19590 This mission-critical project involved a complete interior renovation of a three-story building, focusing on M/E/P and HVAC upgrades to support uninterrupted operations. New systems were installed while the existing air handling system remained active, ensuring minimal disruption to adjacent occupied offices. A fast-track schedule and design-assist approach for key elements… More >

The post Office Building Renovation first appeared on Consigli Construction.

The post Office Building Renovation appeared first on Consigli Construction.

]]>
This mission-critical project involved a complete interior renovation of a three-story building, focusing on M/E/P and HVAC upgrades to support uninterrupted operations. New systems were installed while the existing air handling system remained active, ensuring minimal disruption to adjacent occupied offices. A fast-track schedule and design-assist approach for key elements like the monumental stair ensured seamless execution and timely delivery.

The post Office Building Renovation first appeared on Consigli Construction.

The post Office Building Renovation appeared first on Consigli Construction.

]]>
University Data Center /project/university-data-center/ Mon, 23 Dec 2024 19:27:59 +0000 /?post_type=project&p=19593 The continuously operating Data Center required a renovation and modernization to meet the growing needs of the University. The raised floor data center provides support to the University System and remained in constant operation throughout the renovation. The scope of work included a new raised floor system and vapor barrier… More >

The post University Data Center first appeared on Consigli Construction.

The post University Data Center appeared first on Consigli Construction.

]]>
The continuously operating Data Center required a renovation and modernization to meet the growing needs of the University. The raised floor data center provides support to the University System and remained in constant operation throughout the renovation.

The scope of work included a new raised floor system and vapor barrier walls, new 1,000 kVA electrical service and 800 kW diesel generator, two 300 kVA uninterruptable power system modules, new dual-corded electrical distribution, new fire alarm systems, new air conditioning units and a new VESDA controlled pre-action sprinkler system. Our in-house craftsmen self-performed demolition, concrete, rough carpentry and exterior wall panels.

The post University Data Center first appeared on Consigli Construction.

The post University Data Center appeared first on Consigli Construction.

]]>
Module Data Center /project/module-data-center/ Mon, 23 Dec 2024 19:37:37 +0000 /?post_type=project&p=19595 10,330 sq. ft. interior renovation to the first floor of Module K to create a Tier III Data Center. The project included the construction, commissioning and migration of the Data Center. The project was executed in an existing operation laboratory building and included the installation of two new roof mounted… More >

The post Module Data Center first appeared on Consigli Construction.

The post Module Data Center appeared first on Consigli Construction.

]]>
10,330 sq. ft. interior renovation to the first floor of Module K to create a Tier III Data Center. The project included the construction, commissioning and migration of the Data Center.

The project was executed in an existing operation laboratory building and included the installation of two new roof mounted air-cooled water chillers, two new 1500KW diesel generators, a separate mechanical/electrical floor housed with extensive environmental control systems and installation of two uninterruptable power systems (UPS) including a Liebert UPS and a Piller Rotary UPS.

The post Module Data Center first appeared on Consigli Construction.

The post Module Data Center appeared first on Consigli Construction.

]]>
Summit Data Center /project/summit-data-center/ Mon, 23 Dec 2024 19:55:10 +0000 /?post_type=project&p=19597 1,500 sq. ft. renovation and fit-out of two new Uninterruptible Power Supply (UPS) rooms and associated equipment to bring the existing data center up to client’s engineering standards requiring Tier III diversity of all power requirements and its associated support equipment. The two new UPS system rooms are complete with… More >

The post Summit Data Center first appeared on Consigli Construction.

The post Summit Data Center appeared first on Consigli Construction.

]]>
1,500 sq. ft. renovation and fit-out of two new Uninterruptible Power Supply (UPS) rooms and associated equipment to bring the existing data center up to client’s engineering standards requiring Tier III diversity of all power requirements and its associated support equipment.

The two new UPS system rooms are complete with drywall and utilize existing epoxy painted floors. Additionally, this project included re-work of 25,000 sq. ft. of static dissipative VCT tiles and replacement coving.

The post Summit Data Center first appeared on Consigli Construction.

The post Summit Data Center appeared first on Consigli Construction.

]]>
Celgene Data Center /project/celgene-data-center/ Mon, 23 Dec 2024 20:21:18 +0000 /?post_type=project&p=19600 3,000 sq. ft. renovation of the first floor and basement space of on the client’s Summit New Jersey campus. The project involved the demolition and abatement of a legacy shop area to create a new Tier III (2N) supported data room with dedicated and diverse electrical and mechanical infrastructure, computer… More >

The post Celgene Data Center first appeared on Consigli Construction.

The post Celgene Data Center appeared first on Consigli Construction.

]]>
3,000 sq. ft. renovation of the first floor and basement space of on the client’s Summit New Jersey campus. The project involved the demolition and abatement of a legacy shop area to create a new Tier III (2N) supported data room with dedicated and diverse electrical and mechanical infrastructure, computer room and campus data cabling.

Building S5’s existing infrastructure including utilities and building construction were also addressed. They were upgraded to meet new space and code, fire separation and isolation requirements.

The scope included supporting client’s third party commissioning agent. Contains one 360kW Liebert NXL 3-phase UPS, a 750kW natural gas generator, three 1000 amp Bypass Automatic Transfer Switches and a 360kW Piller CPM rotary UPS.

The post Celgene Data Center first appeared on Consigli Construction.

The post Celgene Data Center appeared first on Consigli Construction.

]]>
Regional Data Center Fit-Out /project/regional-data-center-fit-out/ Mon, 23 Dec 2024 20:51:42 +0000 /?post_type=project&p=19602 280,000 sq. ft. phased fit-out of five data halls. Each 10,000 sq. ft. data hall harnesses 1.5 MW of IT power for a total of 50,000 sq. ft. of server space generating 7.5 MW of power. Operating data halls experienced zero downtime as a result of subsequent data hall construction.… More >

The post Regional Data Center Fit-Out first appeared on Consigli Construction.

The post Regional Data Center Fit-Out appeared first on Consigli Construction.

]]>
280,000 sq. ft. phased fit-out of five data halls. Each 10,000 sq. ft. data hall harnesses 1.5 MW of IT power for a total of 50,000 sq. ft. of server space generating 7.5 MW of power. Operating data halls experienced zero downtime as a result of subsequent data hall construction.

In addition to the data center function, a 600-seat Business Continuity Management (BCM) area was constructed. Build out of the BCM included installation of raised flooring, dedicated HVAC and uninterruptible power supply (UPS) systems, conference rooms, offices, restrooms and coordination of furniture installation.

The scope included extensive coordination of all the underground plumbing and electric with concrete trenches and slab on grade.

The post Regional Data Center Fit-Out first appeared on Consigli Construction.

The post Regional Data Center Fit-Out appeared first on Consigli Construction.

]]>
Data Center Renovation /project/data-center-renovation/ Mon, 23 Dec 2024 20:57:36 +0000 /?post_type=project&p=19604 3,000 sq. ft. interior renovation of existing office space into data center space. This project included the construction, commissioning and migration of the data center, as well as the installation of a roof mounted glycol secondary cooling system.

The post Data Center Renovation first appeared on Consigli Construction.

The post Data Center Renovation appeared first on Consigli Construction.

]]>
3,000 sq. ft. interior renovation of existing office space into data center space. This project included the construction, commissioning and migration of the data center, as well as the installation of a roof mounted glycol secondary cooling system.

The post Data Center Renovation first appeared on Consigli Construction.

The post Data Center Renovation appeared first on Consigli Construction.

]]>
Hardening Project Data Center /project/hardening-project-data-center/ Mon, 23 Dec 2024 21:03:00 +0000 /?post_type=project&p=19606 Upgrade to the infrastructure of the existing operational data center operating environment, critical to the client’s business operations. The scope included: installation of two new primary substations including two service switchgear lineups with two transformers, installation of a new distribution switchgear including phased connection of new source feeders to existing… More >

The post Hardening Project Data Center first appeared on Consigli Construction.

The post Hardening Project Data Center appeared first on Consigli Construction.

]]>
Upgrade to the infrastructure of the existing operational data center operating environment, critical to the client’s business operations. The scope included: installation of two new primary substations including two service switchgear lineups with two transformers, installation of a new distribution switchgear including phased connection of new source feeders to existing transfer switches as well as the construction of a pre-engineered building; reconfiguration of some of the existing distribution feeders; installation of a temporary generator plant to support the site during the upgrades to the existing generator system, and a redundant cooling tower make up water system; expansion of the existing paralleling switchgear to accept the new generator into the existing emergency power generation system; and installation of a new 2500 KW generator.